I Hate Dialysis Message Board
Welcome, Guest. Please login or register.
November 25, 2024, 03:24:08 AM

Login with username, password and session length
Search:     Advanced search
532606 Posts in 33561 Topics by 12678 Members
Latest Member: astrobridge
* Home Help Search Login Register
+  I Hate Dialysis Message Board
|-+  Dialysis Discussion
| |-+  Dialysis: News Articles
| | |-+  Power cut is a shock for dialysis patients
0 Members and 1 Guest are viewing this topic. « previous next »
Pages: [1] Go Down Print
Author Topic: Power cut is a shock for dialysis patients  (Read 1470 times)
okarol
Administrator
Member for Life
*****
Offline Offline

Gender: Female
Posts: 100933


Photo is Jenna - after Disneyland - 1988

WWW
« on: August 12, 2008, 01:09:18 AM »

Power cut is a shock for dialysis patients

raymond.brown@cambridge-news.co.uk

PATIENTS hooked up to kidney dialysis machines were terrified after a power failure at a brand new unit, the News can reveal.

The incident happened at Hinchingbrooke Hospital while 14 patients were connected to the life-saving equipment.

Staff "frantically" disconnected all the patients from the machines - which work as replacement kidneys - to prevent dangerous blood clots from forming.

The power failure, which happened on Friday, lasted between 9.30pm and 10pm. The hospital has assured patients they were not in danger.

One patient, who did not wish to be named, said: "We were all hooked up getting our blood cleaned out of all the nasty things in it and the power went out. There were 14 patients with two of them in isolation.

"It's a brand new unit with all the bells and whistles, but I have never seen nurses move so fast. There were only five nurses who had to rush around unhooking 14 patients.

"It was frantic. Because there was no power it meant our blood was not flowing, which means it will start to coagulate and clot which is very dangerous. What concerned me was that the unit does not have back up power. "

A spokeswoman for Addenbrooke's Hospital, which runs the service at Hinchingbrooke, said the machines had batteries to power them for a short time in the event of problems.

She said: "Although a power cut may be worrying for patients, it does not put them in any danger. Our dialysis machines have internal batteries that power them for 20 minutes while we disconnect people safely.

"Most patients will be able to wait before resuming dialysis without any adverse effect.

"In this case, all the patients involved continued to be treated at Hinchingbrooke 30 minutes after the power went off."

The unit was opened in April and cut travelling times for people waiting for a kidney transplant in Cambridgeshire. It meant patients no longer have to travel to Addenbrooke's Hospital in Cambridge for treatment.

It is the third "satellite" unit operated by Addenbrooke's, joining centres at King's Lynn Hospital in Norfolk and the West Suffolk Hospital.

The unit was supplied and built by German pharmaceutical giant Fresenius Medical Care UK.

http://www.cambridge-news.co.uk/cn_news_home/DisplayArticle.asp?ID=338480
Logged


Admin for IHateDialysis 2008 - 2014, retired.
Jenna is our daughter, bad bladder damaged her kidneys.
Was on in-center hemodialysis 2003-2007.
7 yr transplant lost due to rejection.
She did PD Sept. 2013 - July 2017
Found a swap living donor using social media, friends, family.
New kidney in a paired donation swap July 26, 2017.
Her story ---> https://www.facebook.com/WantedKidneyDonor
Please watch her video: http://youtu.be/D9ZuVJ_s80Y
Living Donors Rock! http://www.livingdonorsonline.org -
News video: http://www.youtube.com/watch?v=J-7KvgQDWpU
twirl
Member for Life
******
Offline Offline

Gender: Female
Posts: 8960


« Reply #1 on: August 14, 2008, 01:58:22 PM »

the Tuesday the hurricane hit everyone on Tues ran an hour shorter
three instead of four
don't ask me why
it was just like another bad thurnder storm
the techs told me and I thought - just my luck ----- I go on MWF
I guess they called everyone
I don't know
Logged
G-Ma
Elite Member
*****
Offline Offline

Gender: Female
Posts: 2191


« Reply #2 on: August 14, 2008, 02:10:37 PM »

Ours in center went out a few weeks ago when a car hit a power pole and we had to start hand cranking, the nurses were very efficient and we had just started when elec co had the power restored.  It was scary but doable and techs were able to help those who could not manage this.
Logged

Lost vision due to retinopathy 12/2005, 30 Laser Surg 2006
ESRD diagnosed 12/2006
03/2007 Fantastic Eye Surgeon in ND got my sight back and implanted lenses in both eyes, great distance & low reading.
Gortex 4/07.  Started dialysis in ND 5/4/2007
Gortex clotted off Thanksgiving Week of 2007, was unclotted and promptly clotted off 1/2 hour later so Permacath Rt chest.
3/2008 move to NC to be close to children.
2 Step fistula, 05/08-elevated 06/08, using mid August.
Aug 5, 08, trained NxStage and Home on 9/3/2008.
Fistulagram 09/2008. In hospital 10/30/08, Bowel Obstruction.
Back to RAI-Latrobe In Center. No home hemo at this time.
GOD IS GOOD
Pages: [1] Go Up Print 
« previous next »
 

Powered by MySQL Powered by PHP SMF 2.0.17 | SMF © 2019, Simple Machines | Terms and Policies Valid XHTML 1.0! Valid CSS!