Guess what Sluff, "The Contractor" is Allan, my man. He is a qualified carpenter, not that he does that for a living anymore, but he is tackling it all himself while still working Full Time.Just wondering if i can still be demanding, after all I'm still paying him in some way LOL
Believe me I'm doing my fair share of cleaning up tools and mess, and guess what he got the first day of hard work, a Massage!So I think I'm doing my part of the deal for the Worker.
We have renovation currently going on in our house. Our bathroom in the master bedroom is completely stripped of tile. They are going to come in a build a bench in it and retile the entire bathroom with new tile , then seal it. It will certainly look different. We also pulled all of the carpet int he main living area and plan to put wood flooring down. The snap and lock kind that will last forever. It is happening slowly. A friend of my hubby's come to work on it at irregular times, so we wait on him. The trees which have to come out of the front yard are still there. One is half way down, but no one has come back to finish the job. *sigh* I will try to post some pics so you all can see the half mess we have here. I can live with tile and and concrete floors for awhile longer, but the bathroom has to be pretty quick.
That is what we are doing but with the floor and tile we are puttiing into the shower. The floor will have a slight slant so all the shower water will drain into one area. A slight roll over the edge of the shower area so he can roll in there as needed with the wheelchair. Good idea. Also a bench will be in the back of the shower area for us to use.Here are some pics of the master bath we have now. Lovely isn't it???
I just look at the mess and upheaval in the house and kick things out of the way as we go through it.