Welcome to the site Donn

We have lots of caregivers and spouses on the site and include a 'special' section

I'm very impressed and happy with caregivers and spouses. I am the patient, do nearly all myself, but it's nice I don't have to carry the boxes.
I am on Nxstage System 1. Setting up takes aprox 20 mins (that's cleaning the cycler, loading a cartridge, hanging saline, putting the cycler on prime) the prime takes 15 mins (the machine does that it self) in that time you can set out the needling stuffs.
The Pureflow makes the dialysate. Loading a Sak after cleaning that part takes about 5-10 mins depending on how smoothly it all goes. The Pureflow takes about 7 hours to make a batch. But that's the machine not you.
If you put all the boxes that come with a delivery with the date/content to the front it takes about 10 mins a month to take stock and order the next delivery.
As always nothing is perfect as either machine or Sak or cartridge might be playing up. For that we have Tech Support (very nice people (mostly)) who help you out (24/7) over the phone. And you want to make sure you have some pre mixed bags in case the Pureflow is very annoying (like 5 mins before finishing deciding to empty)
Take care, Cas